Skip to content

ci: switch from black/isort to ruff #102

ci: switch from black/isort to ruff

ci: switch from black/isort to ruff #102

Triggered via pull request July 12, 2025 17:27
Status Failure
Total duration 23s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.9)
Process completed with exit code 1.
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.13)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_9" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed